HEG LTD. MANDIDEEP | LIST OF SIGNIFICANT ASPECTS AND IMPACTS | F-EMS-14 | ||||||
Date : | 5/6/2010 | |||||||
Section | Activity | Environmental Aspects | Environmental Impact | Operating Condition | Significance Rating | Ref. OCP/EMP | ||
BM | Unloading of CPC in hopper | Dust Emission | Air pollution | Normal | 21 | P-OCP-11 | ||
BM & All Dept. | Storage & Disposal of scrap battery | Spillage of Acid on Ground | Land & Water Pollution | Abnormal | 21 | P-EMS-05 | ||
BAKING | Baking of product Conv. Baking | Smoke Emission from Stack. | Air Pollution | Normal | 29 | P-OCP-03 | ||
BAKING | Baking of product at RH | Smoke Emission from Stack. (Electrostatic Tar Precipitator) | Air Pollution | Normal | 29 | P-OCP-10 | ||
BAKING | Manual Scrapping at Baking & RH | Spillage of Met Coke grains & Dust Emission at work place. | Air Pollution | Normal | 27 | P-OCP-08 | ||
BAKING | Manual Screening of Packing Grain. | Dust Emission at work place. | Air Pollution | Normal | 27 | P-OCP-07 | ||
BAKING | Operation of Scrapping Machine at Baking & RH. | Dust Emission from Stack | Air Pollution | Abnormal | 25 | P-OCP-14 | ||
BAKING | Machining of Baked Electrode from L-70 & BECO m/c. | Dust Emission from Stack | Air Pollution | Abnormal | 25 | P-OCP-20 | ||
ER | Dressing | Used Cotton/Pathological Discharge | Trivial Bacteria and exposure in environment | Abnormal | 27 | P-OCP-18 | ||
ER | Injections | Needles | Land Pollution | Abnormal | 27 | P-OCP-18 | ||
ETP | Primary & Secondery Treatment of effluent water | Sludge | Purification of water by removing floculated sludge from effluent water. | Abnormal | 23 | P-OCP-04 | ||
GRP | Graphtising the Baked Electrode in LWG, Acheson & GF Furnace. | Gas & Fume Emission viz. CO, CO2, SO2 | Air Pollution | Normal | 21 | P-OCP-05 | ||
GRP | Screening / Grain treatment at IGT 1,5 & old GT. | Metcoke Dust, emission through stack | Air Pollution | Normal | 25 | P-OCP-06 | ||
GRP | Consumption of Resource in Graphitisation Process | Consumption of Power, Met coke, Hard board, Water. | Resource Depletion. | Normal | 23 | P-GRP-01,02 & S-GRP-01,02 |
HEG LTD. MANDIDEEP | LIST OF SIGNIFICANT ASPECTS AND IMPACTS | F-EMS-14 | |||||||
Date : | 5/6/2010 | ||||||||
Section | Activity | Environmental Aspects | Environmental Impact | Operating Condition | Significance Rating | Ref. OCP/EMP | |||
RMS/GEP | CPC withdrawl, handling, crushing, screening & grinding. | Emission of SPM. (Dust) | Air Pollution through Stack. | Normal | 23 | P-OCP-19 | |||
RMS/GEP | Unloading, Opening of Pitch Drums / Bags & Breaking of Pitch & filling in Hopper through Grab Bkt. | Emission of Pitch Dust. | Air Pollution at work place. | Normal | 23 | P-OCP-02 | |||
RMS/GEP | Weighing, Mixing & Conditioning of CPC, Green Scrap, Iron Oxide & Staric Acid. | Emission of SPM at Weighing, Mixer & Conditioner Floor. | Air Pollution at work place. | Normal | 23 | P-OCP-13 | |||
RMS/GEP | Recirculation of flying shear pit water into coling bath. | Oil Contaminated Water in cooling bath, storage tank & drain line. | Water Pollution | Normal | 23 | P-OCP-04 | |||
RMS/GEP | Grinding of CPC at R-Mill | Emission of SPM. (Dust) | Air Pollution through Stack. | Normal | 23 | P-OCP-19 | |||
RMS/GEP | Recirculation of flying shear pit water into coling bath. | Oil Contaminated Water in cooling bath, storage tank & drain line. | Water Pollution | Normal | 23 | P-OCP-04 | |||
GEP & IMP. | Operation of HOB. | Emission of SPM. (Dust) | Air Pollution through Stack. | Normal | 23 | P-OCP-33 | |||
PFS | MACHINING OF GRAPHITE ELECTRODES & NIPPLES | Emission of Dust through Stack | AIR POLLUTION | Normal | 27 | P-OCP-25 | |||
PFS | Bagging of Graphite Fines. | Emission of Dust | Emission of Dust | Normal | 21 | P-OCP-26 | |||
S&D | Fumigation of Containers | Emission of Fumes. | Air Pollution Ozone layer depletion | Normal | 23 | P-OCP-15 | |||
TK | Rebaking of Impregnated product in Tunnel kiln through HAG. | Fume Emission | Air Pollution | Abnormal | 21 | P-OCP-32 | |||
PE-M | OPERATION OF STEAM BOILERS IN UTILITY | STACK EMISSION | AIR POLLUTION | Abnormal | 23 | P-OCP-31 | |||
SIGNIFICANT ASPECTS UNDER DESIGN STAGE. | |||||||||
Design Office | Installation of Tunnel Kiln # 3 | Fumes Emission Through Stack. | Air Pollution | Normal | 21 | P-OCP-32 | |||
Design Office | Installation of 5 Nos. 240 K Amps. Graphite LWG Furnace in Hall No. 6 | Gas & Fume Emission viz. CO, CO2, SO2 | Air Pollution | Normal | 21 | P-OCP-05 |
HEG LTD. MANDIDEEP | LIST OF SIGNIFICANT ASPECTS AND IMPACTS | F-EMS-14 | ||||||||||||||||||||
Date : | 5/6/2010 | |||||||||||||||||||||
Section | Activity | Environmental Aspects | Environmental Impact | Operating Condition | Significance Rating | Ref. OCP/EMP | ||||||||||||||||
All Dept. | Cleaning work | Oil socked cotton | Pollution of land | Abnormal | Legal | P-CP-7 | ||||||||||||||||
(Haz.Waste | rule | |||||||||||||||||||||
BM & | All | Painting | Disposal of empty paint drums. | LAND POLLUTION | Abnormal | Legal | P-CP-30 | |||||||||||||||
Dept. | (Haz.Waste | rule | ||||||||||||||||||||
BM & | All | Storage & Disposal of used waste | Spillage of oil on Ground | Land | & | Water | Abnormal | Legal | P-OCP-23 | |||||||||||||
Dept. | oil | Pollution | (Haz.Waste | rule | ||||||||||||||||||
ETP | Pumping of effluent | water | from | Waste water | Land/Water | pollution | Abnormal | Legal (Water act | P-OCP-04 | |||||||||||||
sumps / tanks to ETP | due to over flow. | 1974) | ||||||||||||||||||||
IMP | Vacuuming in A/C. | Pitch fumes emission | through | Air Pollution | Normal | Legal | (Air | act | P-OCP-34 | |||||||||||||
Incinerator stack. | 1981) | |||||||||||||||||||||
IMP | Preheating of Baked | product in | Emission through Stack | Air Pollution | Abnormal | Legal | (Air | act | P-EMP-27 | |||||||||||||
preheaters through hot air generator | 1981) | |||||||||||||||||||||
at FI | ||||||||||||||||||||||
IMP | Preheating of Baked product in | Emission through Stack | Air Pollution | Abnormal | Legal | (Air | act | P-EMP-28 | ||||||||||||||
preheaters through hot air generator | 1981) | |||||||||||||||||||||
at NCI | ||||||||||||||||||||||
REMARK: | ||||||||||||||||||||||
MANAGEMENT HAS DECIDED THAT ASPECTS HAVING SIGNIFICANCE RATING 20 AND ABOVE WILL BE CONSIDRED AS SIGNIFICANT ASPECTS.. |